1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Filing herewith drawings indicating modification of the Mechanical system on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under…
Material hoist. materials only. no work from hoist.
Filing for plumbing work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submitted herewith.
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under t…
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
1st fl. commercial establishment. erect minor interior partitions, new finishes thru-out, new hung ceiling. new plumbing, hvac filed separately. no change in egress, occupancy, or…
Filing for interior renovation for apartment 3C. Scope to includes demo and retro-fit of the bathroom, and kitchen, installation of new appliances, skim coating and painting all wa…
General construction to renovate apt 27b on the 26th floor. work will include new partitions & finishes, and new plumbing fixtures. no change in use, egress, or occupancy under thi…
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Plumbing work for Tokio HCC on 23rd marketing floor (22nd construction)
Structural framing for new hung platform for water heaters and framing to support new hanging MEP units and kitchen equipment on the 1st floor (Cala Scarpetta) as per plans. No cha…
Plumbing work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
Underpinning work as per plans filed. Filed in conjunction with NB #121206569.
Application filed for the combination of units 34 efg. this application is filed to comply with tppn 3 of 97. no change of co required.
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Interior renovation to include demolition of existing and construction of new partitions in suite 500 for existing office space. no change in use, egress, or occupancy.
Removal of plumbing fixtures and related piping on the 8th floor office space. no change to use, egress or occupancy.
Renovate existing ground floor and cellar commercial space; work to include removing and installing non-bearing partition work and finishes. no change to use, egress or occupancy.