1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Installation of new sprinkler layout for the 20th floor office space as per plans. no change to use, egress or occupancy.
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Interior alterations of 18th floor commercial space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Facade restoration, inspection
Installation of temporary shoring as per plans submitted herewith. there is no change in use, egress of occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Shoring and netting to be installed as per drawings for local law 11 repairs
General Construction to take place on the 6th Floor as per drawings filed herewith. No change in use, egress, or occupancy
Sprinkler/standpipe systems in conjunction with Alt-CO as shown on plans.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 47th Floor, as per plans. No change to use,…
General construction for tenant Common Fund on 22nd marketing floor (21st construction)
Interior renovation of phd as indicated on plans filed in conjunction with dob now pl. no change to use, occupancy or egress.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use,…
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Demolition of interior non bearing partitions and windows of existing offices as shown on plans. no change in use, egress, occupancy.
Proposed plumbing work to replace gas stove on existing piping, and to replace sink and dishwasher on existing roughing. no change in use, egress or occupancy.
Modifications to the existing standpipe system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Renovate/combine existing apartment, partitions, flooring, cabinetry, counters, doors, ceiling, fixtures & finishes. no change in use, egress or occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.