Installation of mechanical systems in conjunction with Alt-CO as shown on plans.
Sprinkler/standpipe systems in conjunction with Alt-CO as shown on plans.
Shoring and netting to be installed as per drawings for local law 11 repairs
Modifications to the existing sprinkler system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
General construction for tenant Common Fund on 22nd marketing floor (21st construction)
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathro…
Demolition of interior non bearing partitions and windows of existing offices as shown on plans. no change in use, egress, occupancy.
Interior renovation of phd as indicated on plans filed in conjunction with dob now pl. no change to use, occupancy or egress.
Mechanical work for Common Fund on 22nd marketing floor (21st construction)
Modification to existing plumbing system as per plans filed herewith.
Plumbing work in conjunction with Alt-CO as shown on plans.
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use,…
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 47th Floor, as per plans. No change to use,…
Filing for demolition of metal stair from 35th to 39th floor, infill of existing slab opening on 36th through 39th floors with new slab construction as per plans submitted herewith…
General Construction to take place on the 6th Floor as per drawings filed herewith. No change in use, egress, or occupancy
Proposed plumbing work to replace gas stove on existing piping, and to replace sink and dishwasher on existing roughing. no change in use, egress or occupancy.
Modifications to the existing standpipe system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.