1,183 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,183 permits
Change of use & creation of a) amenity spaces on sub-cellar 1 b) change of use & creation of new leasing office on level 18, c) new accessory stair from level 18 to 19 d) renov, ex…
Filing herewith plans for the installation of a temporary construction fence. No change to use, egress, or occupancy.
Installation of a heavy duty sidewalk shed as per plans during general construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc building…
Hands-on inspection for FISP
Mechanical work on the 6th construction floor and 35th construction floor (36th marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Application filed for Plumbing fixture modification and installation throughout building in conjunction with Application # M00777235. No change to egress, occupancy or use.
Installation of temporary wall & door for new proposed fourth (4th) bedroom , 93.66 sf.no change in use, occupancy or means of egress.
Partial interior renovation of an existing commercial space on the 1st floor. no change to use, egress or occupancy.
Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
South hoist - car 3: equipment use: single #7000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occ…
Filing plans herewith for the Structural related work related to the interior fit out of a proposed McDonalds restaurant. Now change to use, egress, or occupancy under this applica…
Facade modifications for hoist run. No change in use, zoning, or egress.
Structural work as shown on plans filed herewith.
Pre-tenant work 27-29-- plumbing modifications and installations for new bathroom fitout.
Filing herewith for facade repair, railing replacement at roof and garage repairs. there is no change to use, egress, or occupancy.
Proposed removal, relocation and replacement of existing sprinkler heads, as per plan. No change of occupancy, egress or use.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 47th floor (lipsig) as per plans filed herewith. no change in use, egress, o…
Modifications to an existing standpipe system to include installation of new fire pump servicing 100 West Street.