881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at broad st, pearl st, south william st, and coenties alley elevation…
Installation of fall protection as per the plans and specifications to provide safe access to the roofs and attic spaces. no change in use, egress or occupancy.
Demolition to existing mechanical systems as per plans filed herewith. NO change in use, egress or occupancy.
Modification to existing T-Mobile site. Remove 1 antenna frame, relocate 5 antennas, install 1 additional antenna, and relocate 1 RRU on the roof.
Installation of temporary suspended scaffold equipment.
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Installation of sidewalk shed and construction fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of new supplemental Water Source Heat Pump for conference room 43.46
Plumbing renovation of an existing unit 19g on the 19th floor. new kitchen appliances, fixtures and finishes as per plans filed. no change in use occupany or egress.
Installation of temporary storage of materials as per plans. no change in use, egress or occupancy.
Illuminated non-advertising accessory wall sign approved by nyc landmark preservation commission permit# pmw 25-00734 - in property lines - peck slip social. no change of use, egre…
Remove and replace damaged brick. remove all loose mortar atjoints. remove deteriorated wood. facade repairs.
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
IRA to assist with Condition Assessment.