1,195 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,195 permits
Sprinkler modifications taking place on the 18th floor as per plans filed herewith. no change in use, egress, or occupancy.
General Construction as shown on plans filed herewith, No change to use, egress or occupancy.
General construction filed for installation of interior non-bearing partitions and related finishes as shown on plans herewith. No change in use, egress, or occupancy.
Partial demolition drawings for means and methods as shown.
Modification to T-Mobile site. Replace 2 antennas on the facade. Install RRU on facade. Replace 2 RRU in the basement. Remove equipment rack in basement.
Facade restoration/ inspection
Installation of suspended scaffold for facade inspection/repair.
Installation of temporary custom color fence as per plan. no change in use, egress, or occupancy. the sidewalk shed is at maiden lane
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with chapter 33 of nyc b…
Mechanical work as shown on plans filed herewith.
Installation of outriggers for facade repair and inspection
Hereby filing for the interior non load bearing demolition of an existing eating and drinking establishment with minimal storefront replacement. no change to use occupancy or egres…
Installation of single-dual personnel/material hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupan…
Pre-tenant work-- mechanical modifications in conjunction with demo and bathroom fitout.
Hereby filing for the renovation of unit 3g, replacement of fixtures on existing roughs. . no change in use, egress or occupancy.
Structural work as shown on plans filed herewith.
Partial facade masonry removal
Demolition of non-structural facade finishes and substructure. Removal of existing backlit signage. Installation of new facade finishes. No change of use group, occupancy, zoning o…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Pre-tenant work-- modifications to existing sprinkler system in conjunction with demo/bathroom fitout. install tcsp as per plans.