1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
Pre-tenant work-- modifications to existing sprinkler system in conjunction with demo/bathroom fitout. install tcsp as per plans.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Relocate and provide new sprinkler heads on existing sprinkler system for existing office spaces in conjunction with Alt #M01349165 as per plans filed
Filing plans herewith for the mechanical work related to a McDonalds restaurant fit out. No change to use, egress, or occupancy under this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east…
Non-illuminated non-advertising accessory banner on fence for pace university - in property lines. no change of use, egress or occupancy.
Installation of interior temporary working platofrm & overhead protection shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, e…
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Facade alterations and window replacements as shown on the filed plans
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenw…
Plumbing and sprinkler work associated with eating or drinking establishment tenant fitout work.
Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith.
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravit…
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or…
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabil…