881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Wagner Park redevelopment for floor barrier system. (foundation work) Package 4. No change of use egress occupancy under this application.
Sprinkler work taking place on the 1st, mezz 1, 2nd, and mezz 2 floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Renovation of existing residential unit 11a 350 albany street with new plumbing fixtures as per drawings herewith. no change to use, egress or occupancy.
Structural work as shown on plans filed herewith. No change to use, egress or occupancy.
Filing form mechanical work associated with interior renovation of 4th floor ibo office as per plans submitted herewith.
Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
Interior alterations to the 10th and 11th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Reach 6 - Relocate 12 watermains; install valves/boxes at West Thames, Rector, Albany, Gateway. Move hydrant; replace temp waterlines. Install tide gates, manholes, drains, sump pu…
Redevelopment of floor barrier system (structural work) package 4. no change of use egress or occupancy under this application
REDEVELOPMENT OF FLOOD BARRIER SYSTEM. CIVIL GRADING WORK. Package 4. No change of use egress or occupancy under this application
Temporary Installations to be used on a temporary event SailGP AMERICAN TEAM EVENT. All Installations are to be removed upon completion of the event.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing work as shown on plans filed herewith for PMO & Common Corridor . No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Wagner Park redevelopment for floor barrier system. (Earthwork/ Landscape work) Package 4. No change of use egress or occupancy under this application
Install gas barbeque.
Plumbing modifications taking place on 18th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of sidewalk shed and construction fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Suspended Scaffolding for Facade Restoration as Show on Plans