1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
Structural modifications as shown on filed plans
provide pantry sink and HWH for office in conjunction with Alt #M01367407 as per plans filed
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or…
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravit…
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for…
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
provide new sanitary facilities for office in conjunction with Alt #M01355130 as per plans filed
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabil…
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy…
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)