881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
To erect temporary walls as per plans 5th &6th floors. no change in use, occupancy or egress
provide pantry sink and HWH for 8 fl office space in conjunction with Alt #M01389143 as per plans filed
Use of mechanical demolition equipment during partial demolition, filed separately under m08050795
Structural work including new steel framing and support to new elevator rails and buffers at 1st floor, new elevator machines at 8th floor EMR, and new hoist beams below the 8th fl…
Installation of a temporary exterior scaffold as per plans. no change in use, egress or occupancy. scaffold to comply with 2022 nyc building code, chapter 33
Bracing for partial demolition for 47- story building renovation cellar to level 7 as per plans
Replacement of mechinical units on 2nd thru 8th floors. no change in use, egress or occupancy.
Mechanical Systems for floors 2nd through 6th Floor.
Sprinkler work in conjunction with tenant fit-out in Retail 1. Alt 1 121190086
Partial demolition means & methods for structural demolition, filed separately under m00710295.
Remove all interior partitions and build a core and shell for this floor and future tenants. The space will remain unoccupied after completion of this work.
New ductwork and other components for existing HVAC system on portion of the 8 floor in conjunction with Alt # M01389143 as per plans filed
Application is filed for interior removal of non-loadbearing partitions, ceilings, flooring and finishes onfloors 2 - 6 of existing building as per plans submitted.there will be no…
General construction for elevator bank modifications, as shown on plans filed herewith. No change in use, egress, or occupancy.
Mechanical work as shown on plans filed herewith.
interior renovation of existing office on portion of the 8 floor as per plans filed no change in use occupancy or egress
Filing for facade repairs work that includes repair of concrete balconies, repair of deteriorated sealants, application of coatings, etc. as shown on drawings filed herewith. No ch…
Limited exterior repair program, no change to use, egress or occupancy.
Mechanical work for the renovation to existing unit 11o as per plans filed herewith. no change to use, egress, or occupancy.
Installation of 2000 lbs temporary beta max hoist as per plan. no change in use, egress, or occupancy. the beta max material hoist inside the building from the cellar to the first…