1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
General construction modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
New HVAC system on a portion of the 13 floor (marketed as 14) in conjunction with Alt #M01367407 as per plans filed
Mechanical modifications taking place on the 25th floor (26th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
Erect new non-bearing gypsum board demising partition withing single existing bedroom to create two bedrooms. exyend existing ductwork to new bedroom. no change in use, egress or o…
Mechanical modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
General construction for interior renovations, as shown on plans filed herewith. No change in use, egress, or occupancy.
Mechanical work as shown on plans filed herewith.
General construction modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
Re-install additional gas dryer off existing future tee connection and repair dryer venting in response to violation # 039145853m. file for gas connection to replacement gas boiler…
Mechanical work as shown on plans filed herewith for PMO & Corridor. No change to use, egress or occupancy.
General construction work as shown on plans.
General construction modifications taking place on the 25th floor (26th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of gas piping from cellar to floors 1-9 to bulkhead on the roof.
LMH CT 187: Modification to HVAC ductwork, piping and equipment to accommodate the CT upgrade in the existing hospital building as per plans filed herewith only. No change to zonin…
General construction modifications taking place on the 8th floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical ductwork and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.