1,184 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,184 permits
Replace/relocate sprinkler heads as per plans. no change to use, occupancy or egress.
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Application filed for legalization of general construction and interior demolition on the 8th floor. No change in use, egress, or occupancy.
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Interior renovation and mechanical hood of for commercial kitchen at 001 stall#s6, and basement floor #c3, as per plan filed herewith. no change in use, egress or occupancy.
Sprinkler and Standpipe Systems filed in conjunction with ALT #122420193
Removal and installation of ductwork diffusers, fans, and related mechanical piping for 14th floor office space. no change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Interior demo of 13 floor (marketed as 14) offices. Provide partitions and finishes for portion of floor, ceiling to remain open AS PER PLANS FILED NO CHANGE IN USE OCCUPANCY OR EG…
Plumbing Systems filed in conjunction with Alteration M01134265. Cap & Remove Existing Fixtures and Branch Lines. Installation of New Fixtures on New Roughing connecting to existin…
Plumbing modifications taking place on 13th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of construction fence and heavy duty sidewalk shed as per plans. equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…