881 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
881 permits
Mechanical modifications taking place on the 25th floor (26th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 8th floor as per drawings filed herewith. no change in use, egress or occupancy.
General construction work as shown on plans.
Exterior window removal and replacement on floors 2 through 17 only. no change in occupancy, use or egress. existing curtain wall system and spandrel glass to remain.
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Filing for repair of sidewalk air plenum structural framing as per plans submitted herewith.
Sprinkler work taking place on the 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Demolition taking place on the 1st, mezz, 2nd, and 3rd floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Erect a non-illuminated business accessory wall sign. no change in use, egress, or occupancy.
Erect an illuminated business accessory sign in storefront window. no change in use, egress, or occupancy.
Mini crane crane placement. this application involves no change in use occupancy or egress.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
Removal of sprinklers and installation of Temporary Core Sprinkler Protection
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal and installation of non-bearing exterior storefront and related finishes as per drawings filed herewith. no change in use, egress or occupancy. installation of stairs, rail…
Suspended scaffold installation as per plans filed herewith.
The structural work includes the following: provide new framing for cooling tower units, assess structural capacity of roof for new mep units