1,185 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,185 permits
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Installation of new catwalk on the 5th floor and 6th floor. no change in use, egress or occupancy.
Interior renovation/Fit out for new office with existing demising walls as per plans filed herewith. No change to use, egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Plumbing legalization application for the removal of plumbing fixtures on floors 2-14.
General construction as per plans filed herewith. no change to use egress or occupancy.
Interior renovation of existing offices at floors 4, 5, and 10. Work includes removal of existing non-loading partitions and finishes to be replaced as per plans filed. No change t…
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of outriggers for facade repair and inspections
The purpose of this filing is to refurbish existing commercial space as per drawings. No change to egress, use, or occupancy.
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egres…
Installation of temporary beta hoist as per plan. no change in use,egress or occupancy.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
Suspended scaffold plans for facade repairs and inspections
Sprinkler work at 3rd floor as shown in plans.
General construction as shown on plans filed herewith. No change to use, egress or occupancy.
Remove existing partitions and install new partitions and finishes on partial 14th floor in the existing office suite as per plans filed herewith.
Installation of temporary engineered enclosure system as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…