1,184 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,184 permits
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy
Installation of suspended scaffold for facade work or inspection.
Sprinkler work as shown on plans filed herewith.
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold at the northeast elevation from beam system over the equipment to the…
Install new hvac system as per plans. no change to use, occupancy or egress.
Plumbing work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Installation of suspended scaffold for facade work or inspection
Installation of suspended scaffold for facade work and/or inspection. Amend#2 change in tieback and lifeline
Installation of a temporary material rigging as per plans during general construction. no change in use, egress or occupancy. material rigging to comply with 2022 nyc building code…
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Sprinkler work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
Garage repair to include surface preparation and patching of existing concrete slabs
General construction taking place on 13th fl construction (14th fl marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Removal of plumbing fixtures from a retail space.
Structural work as shown on plans filed herewith.