Plumbing fixture removal and replacement in kind for floors 2-17.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications of an existing sprinkler system.
Mechanical work as shown on plans filed herewith.
General construction as shown on plans filed herewith. No change in use, egress or occupancy.
This application is filed for a Temporary Use Permit for a sales office including model apartments on the 9th floor pursuant to section AC 28-111 and Buildings Bulletin 2010-002. F…
Modification to existing VERIZON site on the roof. Replacement of 6 antennas, 6 RRH units and 3 cabinets. Installation of 3 antennas and 3 RRH units. Removal of 3 cabinets on exist…
General construction to renovate apt 524 on the 5th floor. work will include new partitions & finishes, new wood flooring, and new plumbing fixtures. no change in use, egress, or o…
Renovate space as per plans filed
Interior alteration within existing tenant space on 1st floor and partial cellar in existing building: new plumbing fixtures and piping routes per new dental office layout. new plu…
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold in the shaft from the cellar to the 22nd floor
M276 - Replace roof drains and roof trench drains
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Infill of existing escalator and elevator floor openings on the 4th, 5th, and 6th floors. no change in use. occupancy or egress.