1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
Infill of existing escalator and elevator floor openings on the 4th, 5th, and 6th floors. no change in use. occupancy or egress.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Interior alteration within existing tenant space on 1st floor and partial cellar in existing building: new plumbing fixtures and piping routes per new dental office layout. new plu…
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 2nd through 8th floor. No change to egress, use or occupancy.
Mechanical work as shown on plans filed herewith.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 15th through 19th floors. No change to egress, use or occupancy.
Interior renovation to existing retail space to be used as Eating and Drinking Establishment with less than 74 ppl, following the 2022 AC 28-118.3, and therefore the CO is not requ…
interior renovation on the 13th floor - removal of partitions
Outriggers system installation for facade repairs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior plumbing demolition as shown on plans filed herewith
Installation of pipe scaffold, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Plumbing work as shown on plans
Modification of existing sprinkler system for 19th floor office space. no change to use, egress or occupancy.
Air conditioning units replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.
Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building.
interior renovation on the 4th floor
Installation of breeching for boiler replacement. no change to use, egress or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 9th through 14th floors. No change to egress, use or occupancy.
Sprinkler work as shown on plans filed herewith.
General construction as shown on plans filed herewith. No change in use, zoning or egress.