Sprinkler modifications taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffold on broadway and 5th avenue elevation from the top of the sidewalk shed…
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use…
Interior alteration of existing commercial space on 2nd and 3rd floor, including architectural work.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Sprinkler work on the 10th floor (Ramboll) as indicated on drawings.
Sprinkler modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Alteration of existing commercial space on 1st floor including new lighting and heat pump system. no change to egress, use, zoning.
Construction work on the 10th floor (Ramboll) as indicated on drawings.
General Construction Louver work taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
Interior demo of 19,20 & 21 floor interconnecting staircase approximately 750 square feet as per plans. No change in use, egress or occupancy.
Decommission of existing T-MOBILE site on the roof. Initial application filed under DOB # M00004322-I1. No change in use, egress or occupancy.
Structural modifications taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical work on the 7th floor as plans filed herewith. no change in use, egress or occupancy.
Installation of Sidewalk Shed and Pipe Scaffolding as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. No change in use, egress ro occupancy
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy.
STRUCTURAL JOB SCOPE - Opening in existing floor concrete drape mesh for convenience stair and suspended LULA elevator pit.