1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Filing for plumbing work associated with interior demo of 30th floor as per plans submitted herewith.
Remove existing boiler and cap pipes. boiler id#10000003194n0001. there is no change of use, egress, or occupancy filed under this plan.
Sprinkler modifications taking place on 16th floor as per plans filed herewith. no change in use, egress, or occupancy.
General construction from the 7th fl as plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing plumbing fixtures and sprinkler system as per plans filed herewith. No change to use, egress, or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Interior renovation of unit #54 on the 45th floor, replacement, removal and new plumbing fixtures. no change to use, occupancy or egress.
Application filed for removal of non-load bearing partitions, ceiling, flooring, and finishes, electrical, mechanical, and plumbing equipment's. No change to Use, Egress, or Occupa…
Install new kitchen equipments and plumbing fixtures on the existing kitchen at cellar.
Foundation work on the cellar floor as per plans. No change to Use, Egress or Occupancy.
Construction of interior partitions, ceilings and finishes. no change in use, egress, or occupancy.
Plumbing work filed in conjunction with the interior renovation of the commercial space as per plan. No change in use, egress, or occupancy under this application
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Hereby filing to install sprinkler heads with related piping for office reno as shown on plans filed herewith. No change to use, occupancy or egress.
Interior renovation of commercial space. no increase in the bulk . no impact on zoning. no change in use, egress, or occupancy
Industrial rope access for facade inspections.
Interior alteration of existing office . no change in zoning use group, egress or occupancy
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Sub-slab void filling and permeation grouting program. no change to use, egress, or occupancy.