Sprinkler modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Construction work on the 10th floor (Ramboll) as indicated on drawings.
Interior demo of 19,20 & 21 floor interconnecting staircase approximately 750 square feet as per plans. No change in use, egress or occupancy.
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use…
Interior alteration of existing commercial space on 2nd and 3rd floor, including architectural work.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffold on broadway and 5th avenue elevation from the top of the sidewalk shed…
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
General Construction Louver work taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Sprinkler modifications taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Decommission of existing T-MOBILE site on the roof. Initial application filed under DOB # M00004322-I1. No change in use, egress or occupancy.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Structural modifications taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Alteration of existing commercial space on 1st floor including new lighting and heat pump system. no change to egress, use, zoning.
STRUCTURAL JOB SCOPE - Opening in existing floor concrete drape mesh for convenience stair and suspended LULA elevator pit.
Minor partition modification in cellar, replace hvac units on first floor and add hood over new electric pizza ovens.; no change to occupancy use or egress under this application.
Removal and installation of sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Filing for plumbing work associated with interior demo of 30th floor as per plans submitted herewith.
This filing covers the mechanical exhust work associated with the proposed renovation activities on the 3rd, 5th, 10th, and 13th floors.
Plumbing work subsequent to ALTCO.