1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
To file the sprinkler job to address local law 26 of 2004. no change of use, egress, and occupancy.
Exterior facade and roof flashing repairs. No change to use, egress, or occupancy.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Replace air conditioning unit.
Non-illuminated non-advertising accessory wall sign - in property lines - pura vida miami. no change of use, egress or occupancy.
New tenant fit-out (Unit 506) on the 5th floor. Interior renovation of an existing office space as per the plans filed herewith. No change to the use, egress, or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Proposed plumbing work filed in conjunction with DOB Now#: M01311321-I1
Installation of shoring system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
General construction modifications includes on the 16th & 17th fl construction/17th & 18th fl marketing terrace as per plans filed herewith. No change in use, egress, or occupancy.
Application filed for administrative work only. All work performed and completed under application #M00858009-S2. Filing to correct location all as per herewith filed.
Alteration to renovate the existing 3rd floor commercial unit for a beauty salon business. no change to existing use group 6. new, relocation, and replacement of new fixtures and f…
Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. no change to use, egress or occupancy under this application.
Modification of 4 sinks, 1 water closet, 1 washing machine and 1 hot water heater.
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.