1,616 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,616 permits
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of roof overhead protection as per plans. no change in use occupancy or egress under this application. roh shall comply with chapter 33 of the 2022 nyc building code.
Filing for Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.
Construction work on part of the 17th floor to erect demise wall as indicated on drawings.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Application filed for plumbing modifications/additions on the 11th floor (darrow) as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 12th and 14th floors as per plans filed herewith. no change in use, egress, or…
Hvac modifications for cellar of existing commercial building as per plans filed herewith. no change in use, egress or occupancy
Remove illegl rooms @ 2nd fl, incl remove non-load bearing prtns, tile fl & wall finishes, patch & rpr ceil, create vanilla box & restore extg retail (beauty parlor) lgl use. corre…
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
Replacement of cooling tower. no change to use, egress, or occupancy.
Erect accessory business wall sign for los tacos no.1. no change in use, egress or occupancy.
Plumbing work on 1st floor as per plans filed herewith. No change in use, egress or occupancy
Propose plumbing work for an arcade use as per plan. No change in use, egress, or occupancy
Modification of existing plumbing service in association with partial interior renovation of existing office at 9th floor. no change in use, egress or occupancy.
Build out of office space at the 6th floor. No change to use, egress or occupancy.