1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Exterior restoration as per plans filed herewith, No change to use, egress or occupany
Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
Structural work in connection with the interior renovation of existing commercial space. no change in use, occupancy or egress.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Structural reinforcement of existing fire stairs, masonry repairs.
Architectural modifications to the 13th floor as per plans. No change to use, egress, or occupancy.
Application filed for an amended certificate of occupancy for change in use and occupancy. work includes interior/exterior renovation of partitions, ceilings and finishes on all fl…
Filing herewith mechanical work for the building at the address listed. includes new toilet exhaust systems. no change to use, egress, or occupancy.
Application filed for Plumbing and sprinkler modifications/additions as per plans filed herewith.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.