1,326 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,326 permits
Application filed for plumbing additions/modifications on the 7th floor as per plans filed herewith. no change in use, egress, or occupancy.
Removal & installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change of use, occupancy and egress.
Removal of interior non load bearing partitions and finishes as per plans
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Subsequent application filed for sprinkler modifications/additions on the 7th fl (suite 706) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing and Sprinkler work being filed on the 6th floor. No change to use, egress or occupancy.
Hereby filing to install new plumbing fixtures and related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
To install reception desk on 10th floor. this job is in conjunction with alt1# 121692828.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Structural work related to the replacement of one (1) new cooling tower and filtration system. no change to use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 7th floor as per plans filed herewith. no change in use, egress, or occupanc…
Interior renovation to include demolition of existing and construction of new partitions in suite 1610 for existing office space. no change in use, egress, or occupancy.
Install new commercial kitchen hood system for commercial store on the 1st floor , no change in use, egress and occupancy.