1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Interior renovation of apt 4e at partial 4th floor as per plans filed herewith
PL and SP work as per plans filed.
AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
Infill of lot line windows as noted on plans. No change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th fl (bathrooms) as per plans filed herewith. no change in use, egress, or…
Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
#8964 - removal of non bearing partitions, flooring and fixtures. level existing floors. no change in use, egress or occupancy.
Plumbing work on the 20th floor (Petfolk) as indicated on drawings.
install sink, cap and remove hand sink and floor sink, also, install water and sanitary piping (plumbing), also install 2 sprinkler heads at windows and relocate five sprinkler hea…
Exterior repairs include select brick masonry and terra cotta repairs as shown on drawings and as specified. no change in use, occupancy or egress.
Mechanical work on the 64th floor as plans filed herewith. No change in use, egress or occupancy.
Facade, exterior, masonry and limited steel repairs as per drawings. No change in use, egress or occupancy is involved under this application.
At 27th floor public bathrooms, installation of interior partitions & finishes as per plans filed herewith. no change in use, occupancy or egress.
Minor plumbing modifications for medical office on 7th fl. no change to use, egress or occupancy
AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
Initial cd5: inspection & fisp repairs per plans no change in use egress or occupancy
Installation of new hvac systems as per plan.
Plumbing work on the 39th floor (Kyriba) as indicated on drawings.
Filing for plumbing work at the 2nd floor. No change to use, egress, or occupancy.
Removal of existing finishes. erection of minor partitions, millwork, new lighting and new finishes throughout