1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
#8964 - removal of non bearing partitions, flooring and fixtures. level existing floors. no change in use, egress or occupancy.
Minor plumbing modifications for medical office on 7th fl. no change to use, egress or occupancy
Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
Plumbing work on the 20th floor (Petfolk) as indicated on drawings.
At 27th floor public bathrooms, installation of interior partitions & finishes as per plans filed herewith. no change in use, occupancy or egress.
Facade, exterior, masonry and limited steel repairs as per drawings. No change in use, egress or occupancy is involved under this application.
Exterior repairs include select brick masonry and terra cotta repairs as shown on drawings and as specified. no change in use, occupancy or egress.
Plumbing work on the 39th floor (Kyriba) as indicated on drawings.
Removal of existing finishes. erection of minor partitions, millwork, new lighting and new finishes throughout
install sink, cap and remove hand sink and floor sink, also, install water and sanitary piping (plumbing), also install 2 sprinkler heads at windows and relocate five sprinkler hea…
Installation of temporary construction fence. No change of use, occupancy, or egress filed under this application.
AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
Initial cd5: inspection & fisp repairs per plans no change in use egress or occupancy
Infill of lot line windows as noted on plans. No change in use, egress or occupancy.
Installation of new hvac systems as per plan.
Filing for plumbing work at the 2nd floor. No change to use, egress, or occupancy.
Mechanical work on the 64th floor as plans filed herewith. No change in use, egress or occupancy.
Plumbing modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.