3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing
Construction Equipment for Full Building Demolition
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Construction Equipment for Full Demolition
Suspended scaffold outrigger system for exterior facade painting works and inspection at 273 west 38th street, manhattan, ny 10018
Plumbing work to apartment 8d as per plans filed herewith. no change to use, egress or occupancy.
Filing herewith Mechanical work as per per plans filed herewith. No change to use, egress or occupancy.
Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
Architectural scope associated with the renovation of the terrace on the 21C/22M floor in compliance with the BB 2018-002. No change of use, egress or occupancy.
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Install (13) WCs, (9) Lavatories, (4) urinals, (2) DWs, (6) sinks, (1) CM, (2) IM, (8) Floor drains, (4) HWH and associated CW/sanitary piping on the 21st Floor as per plans (RGHQ…
Interior removals work at 50m/49c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
Sprinkler demolition on the 3rd floor, 23rd floor construction (24th floor marketing) 24th floor construction (25th floor marketing) as indicated on drawings.
Modification to existing Sprinkler & plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
Build out Plumbing system installation associated with new building construction filed under job number 121209192.
Modifications to the existing mechanical system including installation of DOAS boxes and associated finishes. No change in use, egress or occupancy.
Infill existing stair and provide new framing and concrete slab on metal deck on partial 22nd floor as per plans. No change to use, egress or occupancy.
Replace oil burner on existing low pressure boiler. change grade of fuel oil from #4 to #2. no change in use, egress, or occupancy is involved under this application.