2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Filing for obtaining certificate of compliance of existing a/c. no change of use, egress and occupancy.
Herewith Filing for the removal of an existing mezzanine (MZ1) as refenced on plans .
Herewith Filing interior demolition of existing eating and drinking establishment as per plans. No Change in Use, Egress or Occupancy is proposed.
Install new cold-formed steel stud walls at the atrium & steel frame for pivot door at the E. Gallery, infill of exist. slab opening at the grease trap, & steel framing and slab op…
Structural modifications as per plans filed herewith. No change to use, egress, or occupancy.
Removal of existing sprinkler system and new temp loop sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Alterations to sprinkler system on 43rd floor as per plans. No change to use. egress or occupancy.
Structural work as shown on the plans.
Structural repairs taking place on the 1, cellar and sub cellar 2as per plans filed herewith. No change in use, egress or occupancy
Installation of new heads and removal of heads on cellar level as per plans filed herewith.
Subsequent filing for plumbing system modification in an existing retail space as per the plans filed herewith. No change in use, egress or occupancy.
Plumbing and Sprinkler scope associated with the renovation of the one tenant office space on 21M/20C floor. No change of use, egress, or occupancy.
Sidewalk shed installation as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Mechanical modificiations takign place on the 1st fl lobby as per plans filed herewith. no change in use, egress or occupancy.
Plumbing work on the 31st floor as indicated on drawings.
full demolition of structure using hand held and mechanical to assist
Correcting the swarmp & unsafe conditions as cited on the 9th cycle fisp report submitted to the ny department of buildings. no change in use, egress or occupancy.