3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Application being filed to show 21st Floor residential amenity lounge seating replacement, minor electric and lighting scope with finish updates in designate area. No change in use…
Installation of suspended scaffold for facade work and/or inspection. Amend #3, changer in tieback to bulkhead
Interior renovation as per plans filed herewith. No change in use, occupancy or egress.
General construction for lobby renovation includes discrete upgrades to the interior lobby and exterior arcade finishes. no change to occupancy, use or egress.
Selective interior demolition of architectural, mechanical, electrical, plumbing, and fire protection systems on 30th construction floor (32nd marketing floor). proskauer pilot
Modifications to the existing sprinkler system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st & 2nd floors (Harry Winston Retail) as per plans. No change to use, egress o…
Mechanical work as per plans to include installation of one water cooled heat pump.
Mechanical modifications taking place on 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications on 20th floor as per plans filed herewith. No change to use, egress or occupancy.
Plumbing, Sprinkler and Standpipe modifications on floors 1-4 and 9-10 as per plans filed herewith. No changes in use, egress or occupancy,
Sprinkler work to include furnishing and installing sprinkler main, branch piping and sprinkler heads. Plumbing work to include furnishing and installing new plumbing fixtures and…
Installation of temporary roof protection as per plan. no change in use,egress, or occupancy.the roof protection at the east neighbor's roof and rear yard.
Modification of air device with ducts, and installation of exhaust fan and radiation.
Interior renovation of existing apartment unit 61T.
Interior renovations on teh 29th floor as per plans.
Modify ductwork.
Remove 155 existing sprinkler heads, install 11 temporary loop heads & install 106 permanent sprinkler heads and piping.
Propose installation of vav boxes, fan power boxes and associated ductwork and piping. Installation of supplemental AC units and associated ductwork and piping. No change in use, e…
Modifications to the existing HVAC system on the 1st & 2nd floors (Harry Winston - Retail) as per plans. No change to use, egress or occupancy