3,509 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,509 permits
Sprinkler modifications taking place on the 9th floor as indicated on the drawings.
Alterations to plumbing system on 7th floor terrace as per plans. No change to use, egress or occupancy.
Modify ductwork and install recovery units along with condensing units for coc per plans.
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
Facade Repairs as shown in filed drawings. No change in egress, use or occupancy.
Modificagtion to existing mechanical system, diffuser, ductwork and related piping as shown on drawings. no change to use, egress or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
General construction on floors 3-10 as per plans filed herewith. No changes in use, egress or occupancy.
Hereby filing to replace and install new plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Modify plumbing fixtures and related piping as per plans. No change in use, egress or occupancy.
Construct interior partitions, ceilings and doors.
Removal and installation of new partitions, ceilings, finishes and fixtures as shown on drawings. no change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Modification to plumbing system as per plans filed herewith (15 and 16thf floors)
Combine apartments 36A and 36B. Eliminate one kitchen. Remove and install minor interior partition work, finishes, etc. No change in use, egress or occupancy.
Filing for minor duct work in conjunction with the combination of the apartments.
Ttd - const. fl 40 / marketing fl 42 filing herewith for the addition/modification to an existing sprinkler system as shown on plans. there will be no change of use, occupancy or e…
Install exterior illuminated wall sign (u.s. polo assn.)
Mechanical work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
ICG Capital / Robeco Turnkey - Plumbing work on the 21st floor as indicated on drawings.