3,509 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,509 permits
Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy.
Demolition and Construction of Partitions, Doors, Millwork, Wall & Floor Finishes, Patch Existing Ceiling and Renovate Existing Pantry on Part of the 11th Floor. No Change to Occup…
Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith
Build out of interior non-bearing partitions and related finishes, hung ceilings and relatedwork, as per drawings filed herewith. no change in use, egress or occupancy.
Application file to interior renovation exist. store as remove & install partition, ceiling, floor tiles and store front work at 1st floor for haagen-dazs ice cream store as per pl…
Prop. plumbing & sprinkler work at exist. 4th-flr. office to support int. renovation per Job# M01276523-I1. Scope includes installation of 54 new sprinkler heads w/piping to exist,…
Herewith Filing Structural Work in conjunction with interior renovations, work includes the installation of concrete pads and steel supports for Mechanical equipment and new conven…
Installation of temporary scaffold for building construction. No change in use, egress, or occupancy.
Sprinkler modifications taking place on 37th floor construction (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Strengthening of Level 1 masonry backup wall
Install exterior illuminated sign on existing marquee (voco by ihg)
Filing herewith for installation of Exhaust Fan and Precipitator serving Kitchen on 1st floor (STK Grace)
Minor Modifications to the Existing Air Conditioning Ductwork, Installation of Volume Dampers, Supply Air Registers, Return Air Grilles & Return Air Openings in Walls on Part of th…
Replace the existing flashing illuminated wall changeable led screen panel sign, on the existing wall structure, no change to use, egress or occupation.
Interior renovations for dental office at 8th floor , no change to use, egress or occupancy
Filing sp for work related to interior alteration and fitout of 2nd floor of assembly restaurant
Modifications to the existing plumbing system on the 39th and 40th floors as per plans. No change to use, egress or occupancy.
Modifications to sprinkler system on 6th floor as per plans filed herewith.