Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress, or occupancy.
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partiti…
Replace the existing flashing illuminated wall changeable led screen panel sign, on the existing wall structure, no change to use, egress or occupation.
Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy.
Build out of interior non-bearing partitions and related finishes, hung ceilings and relatedwork, as per drawings filed herewith. no change in use, egress or occupancy.
Filing herewith for below-grade basements and foundations work as per plans. The proposed work is previously approved under NB M00615380. This Application is being filed to separat…
Modifications to the existing plumbing system on the 30th Floors as per plans. No change to use, egress or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Sprinkler modifications taking place on 37th floor construction (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
Modifications to the existing sprinkler system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit Out) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Modifications to mechanical system on partial 4th floor as per plans. No change to use, egress or occupancy.
Structural work on 26th and 27th floors as shown herewith. no changes to egress, occupancy or use.
Interior renovation within the limits of apt 36-d only. no demolition of structural elements. no change of use, egress or occupancy.
Modifications to the existing sprinkler system on the cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Modification to existing plumbing & sprinkler systems. No change in use, egress or occupancy.
Plumbing modifications as related to interior renovation. no changes to use, occupancy or egress. scopeincludes removal of existing plumbing fixtures, and installation of new appli…
Removal of the existing slab & existing steel beams for new stair opening, new steel beams for stair structure & framing of the new stair opening, new steel for the support of a ne…