3,508 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,508 permits
Proposed non-structural interior modification including modification at the kitchen and bathroom along with interior finish modifications throughout. no change in use, egress, or o…
Install of temp platform, no alt to exist structures for Ralph Lauren Olympic Sculptures. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All p…
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Interior mechancial work on 26 and 27th floors as shown herewith. no changes to egress, occupancy or use
Interior renovation within the limits of apt 36-d only. no demolition of structural elements. no change of use, egress or occupancy.
Proposed interior renovation on cellar, 1st thru. 2nd floor. plumbing works as per plan. no change in use, bulk, egress or occupancy.
Alterations to 7th floor terrace as per plans. No change to use, egress or occupancy.
Filing demo work as per plans filed. no change to use, egress or occupancy.
Structural repairs for tenant space facing 39th street as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit Out) as per plans. No change to use, egress or occupancy.
Install (324) new sprinkler heads and associated sprinkler piping on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Install exterior illuminated sign on existing marquee (voco roof bar)
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Modifications to the existing sprinkler system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
General construction for office fit out for Cumming Group on 12th floor
Removal and installation of partitions, ceilings, door and finshes as shown on drawings. no change to use, egress or occupancy.
Modifications to the existing sprinkler system on the cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Modification to existing plumbing & sprinkler systems. No change in use, egress or occupancy.