3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Use of temporary mini crane constructions equipment as per plans filed herewith.
Modification of plumbing fixtures and sprinkler system as per plans filed herewith, no change in use, egress or occupancy under this application.
Structural modifications as per plans filed herewith. No change to use, egress, or occupancy is proposed.
Exterior facade repairs which include demo and properly dispose of existing marble veneer, remove, patch, waterproof and install new veneer as per plans filed herewith. no change i…
Mechanical systems modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed
Modifications to the existing plumbing system on the 32nd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.
Plumbing - Remove existing bathroom plumbing fixtures and provide new. Provide two additional sinks
Pl work in suite 1100b filed in conjunction with dob now gc. no change to use, occupancy or egress.
Herewith filing interior alterations to an existing commercial space at 1st and 2nd floor, as per plans submitted. No change to use, egress or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Modification to an existing Sprinkler System
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 17th thru 21st floors (Louis Vuitton - North America Fit Out) as per plans. No change to use, egress or occupancy
Mechanical work taking place on the 14th and 15th floors as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Installation of suspended scaffold for facade work or inspection.
Facade repairs as per plans filed. no change in use or egress under this application.
Plumbing modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed
Filing for modifications to existing plumbing systems at cellar and first floor. There is no change to use, egress or occupancy.