Partial 15th floor interior work as per plans filed. no change to use, egress or occupancy.
renovate apartment 8G, partition, plumbing, electrical work, partial window replacement, no change to use, exits or occupancy
Filing herewith mechanical work as per plans for office renovation.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.
Propose interior partition and finish demolition work at the cellar and 1st floor commercial space as per plan. No change in use egress, or occupancy.
Plumbing work in conjuction with interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Filing herewith renovation of existing office as per plans.
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings fo…
Reinforcement at 30th floor to accommodate increased live load as shown on drawings. No change in use, egress or occupancy.
Plumbing work being filed in conjunction with Alteration 2 application number 123771276 to renovate units on the 24th through 27th floors and public halls. No change to use, egress…
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing plumbing system on the 14th & 17th Floors (ICBC) as per plans. No change to use, egress or occupancy.
Foundation work related to enlargement of existing 8-story buidling to add 8 floors & new roof. application filed in conjunction with m01003551-i1 (alto co)
Filing herewith for extrerior repairs as per drawings. there is no change to use, egress, or occupancy.
Renovation of existing commercial space on partial first floor with plumbing work: new hand sink, 3-comp. sink and ice maker in 1st floor as per plan; no change in use, egress or o…
Modification to existing pluming fixtures and related piping as shown on drawings. no change to use, egress or occupancy/
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, eg…
Installation of temorary plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use, egress…