818 issued permits in Murray Hill-Kips Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
818 permits
Filing for removal of interior non load bearing partitions and finishes as per plans filed herewith. This property is participating in the Major Projects Program - Project# 409.
interior renovation of unit 3D. Work to include new washer/dryer, replacement of kitchen and bathroom with new and minor layout change.
Facade repair which includes re- pointing, window sill brownstone repair and brownstone repair as per plans @ exposure 1. sidewalk shed filed under a separate application.
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. No change to use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Construction fence as per drawings during bldg demolition, filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this ap…
Alteration of combined apartment on 9th floor and penthouse floor to install new stair.
Subsequent application filed for sprinkler modifications/additions on the 11th floor as per plans filed herewith. no change in use, egress or occupancy.
Subsequent application filed for plumbing modifications/additions on the 11th floor as per plans filed herewith. no change in use, egress or occupancy.
This application is filed for a temporary use permit for a sales office including model apartments pursuant to section ac 28-111 and buildings bulletin 2010-002.
Nyu langone health - acc 16 cardia rehab reno p2 filing - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a suspended scaffold for facade inspection and repair as per plan submitted. no change to egress of occupancy.
Installation of fence with 3' 0 from property line as indicated on drawings
General construction renovation of existing television studios and restrooms. Work involves addition of pantry and relocation of restroom.
Installation of fence within 3' from property line as indicated on drawings.
Proposed installation of 1 illuminated non-flashing double faced accessory business sign. wording kjun logo