818 issued permits in Murray Hill-Kips Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
818 permits
Installation of temporary construction fence as per drawings. fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
At first floor, modification to egress and egress door/facade assembly. no change in use or occupancy,
At 9thfloor south and and 10thfloor entire tenant space, modifications to existing sprinkler and standpipe system as per plans filed herewith. no change to occupancy or means of eg…
Overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Herewith filing for facade repairs as per plans. No change in use, occupancy, or egress.
Filing for removal of related bulkheads and associated work throughout the building as per plans filed herewith. No change in use, egress or occupancy in this application.
Mechanical work to lobby as per plans filed herewith. no change to use, egress or occupancy.
Provide A new wet, automatic fire sprinkler system sourced from a new combined domestic/fire water service with a new sprinkler booster pump.
Propose new domestic water service, booster pump and well tank; hot water via boiler and indirect water heater; sanitary and storm system; new gas line for boiler and gas appliance…
Reconnect existing low pressure gas line. no change in means of egress use group or occupancy.
Plumbing scope related to amenity renovation at the 8th, No change to use, egress or occupancy.