1,030 issued permits in SoHo-Little Italy-Hudson Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,030 permits
Adding operable glass doors to sides of an existing metal and glass canopy in rear yard.
Create openings in south lot line exterior wall and install two windows. No change to use, egress or occupancy.
Proposed Pluming work type filed in conjunctions with ALT-1 110296028
Minor partition work with general carpentry work in apt 10. No change to use , bulk or egress
Exterior and interior renovation of 6th Fl JLWQA, penthouse and private terrace. No change to use, occupancy, or egress.
Create opening on west lot line wall for two windows in aparttment 4w on the 4th floor. no change to use, egress or occupancy.
New SP installation filed in conjunction with ALT1 #110296028
Proposed facade repairs including parapet wall repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Suspended Scaffold for Painting as Shown on Plans
Suspended scaffold installation for facade repairs and inspections
Replace main and bulkhead roof, facade repairs, balcony repairs, and railing repairs. no change in use, occupancy or egress.
Structural modifications to floors 4th thru 6th as plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Propose to eliminate public assembly space on 7th floor as per plans filed herewith. No work is proposed under this application.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
General construction modifications taking place on the _6,7,8___ floor as per plans filed herewith. No change in use, egress or occupancy
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical changes on the 2nd floor as indicated on drawings.
Plumbing changes on the 2nd floor as indicated on drawings.
Architectural changes on the 1st and 2nd floors as indicated on drawings.