Herewith filing for removal of existing mechanical systems throughout and installation of new mechanical systems on the cellar, 1st, 2nd & roof levels. No change in use, occupancy,…
Renovate suite 308 on 3rd fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy
General construction for renovation to office space for Lieff Cabraser on 8th floor.
Renovation and replacement of existing roof and masonry repair of existing building. new accessory roof terrace and exterior cooking area. architectural work. new co to be obtained…
Temporary Installations to be used on a temporary event YSL VDay(TPA M01349561-I1). All the Installations are to be removed upon completion of the event.
Interior renovation at existing 2nd floor commercial space. no change in use, occupancy and egress. replace existing plumbing fixtures. replace exposed mechanical metal ducts.
Installation of a temporary supported scaffold, roof and overhead, protection, per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Mechanical work on 1st floor as per plans filed herewith. No Change in Use, Egress or Occupancy.
Structural work on roof. no change in use, occupancy, or egress.
Plumbing work including removal, relocation, and replacement of plumbing fixtures, appliances, equipment, and associated plumbing as indicated in plans. no change to egress, occupa…
Replace ductless air-cooled split-system with ducted at interior as indicated in plans. replace condenser and mounting brackets at exterior. no change to egress, occupancy or use.
Filing for architectural interior renovations installation of interior non-bearing partitions and related finishes of 8th floor space as per plans filed herewith. no change in egre…