2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Proposed installation of pipe scaffold for repairs as per plans. no change in use occupancy or egress under this application.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Facade repairs or LL11 repair work as per plans filed herewith. No change to use, egress, or occupancy as of right.
Plumbing fixtures filed with the combination of apts in apts 15 ab no change to use, occupancy or egress.
Removal of existing PTAC units and installation of new HVAC system with condenser on yhe roof and indoor AC units as per plans filed herewith. No change in use, egress and occupanc…
Refurbish existing doctors office at the 1st floor
Herewith filling for structural modification between the 7th and 8th floor as per plans. no change to use, occupancy or egrss under this application.
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Mechanical modificationst taking place on the cellar & 1st floor as per drawings filed herewith. no change in use, egress or occupancy.
Temporary worker/contractor shed/office as per drawings. worker/contractor shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application…
Remove, replace ,relocate and install new plumbing fixtures in conjunction with the renovation to apartment 12a on the 12th floor. general construction filed under alteration no m0…
Minor plumbing work associated with apartment 20a renovation. no change in occupancy use or egress.
Replacement of mechaical equipment as shown on plans.
2022 NYC BC Art. 28-104.7: Scope of work: Create a new bedroom by constructing interior non-bearing walls and a door within an existing apartment. No change to use, egress of occup…
Interior renovation of existing apartment #2D. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith. No change in use, egress,…
General construction architectural for the renovation of existing duplex apartment #4 on the 2nd & 3rd floors. as per plans filed herewith. no change of use, egress, or occupancy.