593 issued permits in Upper East Side-Yorkville, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
593 permits
Interior renovation of apartment unit 1a. install new partition, flooring, doors, and refinish exg. kitchen and bathroom. no change in use egress or occupancy.
Decommission of existing tmo site. remove 6 antennas, 8 rrh and 1 gps from roof. remove equipment platform & dunnage from roof. remove cables & conduit from basement,facade and roo…
Provide support of excavation work as per plans filed. subsequent filing to nb #m00625489.
Repair work to the existing facade, parapets and lightwells. new roof waterproofing to be installed.
Heating, ventilation, and air conditioning work as per the architectural layout.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed on sidewalk and walkway as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Minor apartment renovation to existing bathroom and new laundry closet in apt 27C. Minor plumbing work to be filed subsequently. No change to use, egress or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Install a self venting washer dryer on existing risers in unit h 5th floor
Installation of temporary shoring and netting as per plans submitted herewith. there is no chsange in use, egress or occupancy.
Plumbing modifications for apt 7a. no change in use, egress or occupancy.
Installation of plumbing fixtures along with associated piping in conjunction with the renovation of existing apartment in multi-family co-op.
Garage repairs as per plans submitted herewith. there is no chsange in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.