1,130 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,130 permits
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Renovation of existing triplex apartment. this alteration will consist of the renovation of bathrooms and general partition walls as per plans. no change to use, egress or occupanc…
Installation of booster pump, express riser, and assosiated piping as shown on plans
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
Interior renovation of Atria (Senior Living Facility) Associated with the Mechanical work scope.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Outriggers system installation , material hoist and inspection for facade repairs.
Masonry facade repairs and replacing flat roofing at the one story extension. No change to use, egress or occupancy.
Interior renovation of the building associated with the GC scope of work. This ALT-CO application is filed to obtain new CO for the building and supersede open ALT-1 no work applic…
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of temporary suspended scaffold equipment.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replacement of two fixtures in the existing bathroom. Installation of a three-compartment sink and a grease trap. Connection of espresso, ice machine and a hand wash sink. NO GAS W…
1. New mechanical mezzanine between 1st & 2nd Floor. 2. First Floor partial demolition and reframing 3.Cellar and First Floor slab infill 4. New elevator.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Facade repairs, scaffold inspections, 3 men letter
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Proposed installation of a temporary sidewalk shed and supported scaffolding as per plans submitted. work shall comply with 2014 building codes, chapter33. no changes in use, egres…