875 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
875 permits
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress o…
General construction work to renovate apartment phe on the 15th & penthouse (16th) floor. construction work as per plan. no change in egress, use or occupancy.
Installation of temporary roof & overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Mechanical work in conjunction with the OT # M01249713-I1
Facade repairs, scaffold inspections, 3 men letter
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Remove existing roofing components, and replace them with the new roofing system. the existing roof structure remains untouched.
Filing for facade repairs work that includes replacement of ornamental limestone units, repair of eroded mortar joints, repair of ornamental terracotta blocks, etc. as shown on dra…
Facade repairs, including masonry restoration and replacement, with no changes to use, egress, or occupancy.
Installation and use of temporary roof & overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Propose sprinker work filed in conjunction with alt-co job #m00784380-i1
Supported Scaffold
Fn/ps334m - for temporary construction equipment (fence)submitting on behalf of contractor, related to job #m00672512, no change in use,occupancy or egress
Mechanical filing subsequent to gc filing - design includes the installation of air conditioning system. no change in use, egress, or occupancy under this filing.
Herewith filing plumbing modifications for combination of apts 5a and 5b per plans.
HVAC system for Apartment #8W on the 8th floor. No change to use, egress or occupancy.
Limited Facade Repairs. Patching of the deteriorated concrete