875 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
875 permits
Renovation of existing triplex apartment. this alteration will consist of the renovation of bathrooms and general partition walls as per plans. no change to use, egress or occupanc…
Installation of booster pump, express riser, and assosiated piping as shown on plans
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Plumbing and sprinkler scope associated with apartment renovation as per plans filed herewith.
Interior renovation of the building, Associated with the Structural Work Scope.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Interior renovation of the building associated with the GC scope of work. This ALT-CO application is filed to obtain new CO for the building and supersede open ALT-1 no work applic…
Replacement of two fixtures in the existing bathroom. Installation of a three-compartment sink and a grease trap. Connection of espresso, ice machine and a hand wash sink. NO GAS W…
Masonry facade repairs and replacing flat roofing at the one story extension. No change to use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Installation of temporary suspended scaffold equipment.
Application filed for exterior stair restoration as per drawings filed herewith.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Facade repairs, scaffold inspections, 3 men letter
1. New mechanical mezzanine between 1st & 2nd Floor. 2. First Floor partial demolition and reframing 3.Cellar and First Floor slab infill 4. New elevator.
Proposed installation of a temporary sidewalk shed and supported scaffolding as per plans submitted. work shall comply with 2014 building codes, chapter33. no changes in use, egres…
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
Outriggers system installation , material hoist and inspection for facade repairs.