875 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
875 permits
9th Cycle FISP Repair. No change to use, egress or occupancy.
Filing for new plumbing work on the 6th Floor. No change to use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Repairs to exterior wall finishes. No change to use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Re-stain building entrance door, re-tile public hall and vestibule throughout, replace stone treads. nochange in use, egress or occupancy.
Facade repairwork as per plans filed herewith. no change to use, egress or occupancy.
Remove building entrance and vestibule doors and install new doors. Re-tile vestibule and lobby/public hall on cellar level. No change in use, egress or occupancy
Interior renovation of apt 3b on the third floor. no change in use, egress or occupancy.
Structural work type in conjunction with doc 1 to remove column dividing cellar entry door and widen existing doorway. no change to use, egress or occupancy.
Install outrigger suspended scaffolding during facade restoration work with periodic inspections