944 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
944 permits
Install new sprinkler system as per plan. there is no change of use, egress, or occupancy filed under this plan.
Install 8' temporary construction fence at the above address
Install new plumbing fixtures as per plan. there is no change of use, egress, or occupancy filed under this plan.
Mlk - filing herewith for the structural work related to the cafeteria upgrade of the existing school. there will be no change in egress, occupancy or use.
Mlk - filing herewith for the mechanical work related to the cafeteria upgradeof the existing school. there will be no change in egress, occupancy or use.
Installation of temporary construction fence for hs 490m at 122 amsterdam avenue, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under th…
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
Mlk -filing herewith for the cafeteria upgrade of the existing school. there will be no change in egress, occupancy or use.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Install new partition wall for existing restaurant space as per plan filed herewith. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Support of excavation work for horizontal enlargement, in conjunction with Alteration M00905707-I1.
Alt type 2 to update the bathroom and install a new wood floor over existing floor. no change in use, egress or occupancy.
General construction proposed in existing unit #6B on the 6th floor. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy u…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of contractor's shanty on existing sidewalk shed as per plan and in accordance with Chapter 33 of NYC Building Code. Existing sidewalk shed filed under application M01…
File minor interior construction work of apartment #2, #3, #5 to repair wall and ceiling, install laminate floor tiles, cabinets and paint as per plan. no change in use, egress or…
Plumbing work as per plans. No change in use, egress or occupancy
Install (1) new kitchen hood and (1) split unit system at first floor. no change in use, egress, or occupancy
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…