754 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
754 permits
Interior garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Plumbing filed in conjunction with renovation of apartment #16p. relocate kitchen sink and dishwasher and replace washing machine. no change in use, occupancy or egress.
Herewith filing for sprinkler modifications as per plans. no change in use, egress or occupancy.
Exterior repairs to include sill and lintel replacement, brickwork, sealant and stucco repairs as per plans filed herewith. no change to use, egress or occupancy
Modifications to plumbing systems as per plans filed herewith. No change to use, occupancy or egress.
Sidewalk replacement, closure of lightwells, lightwell grate replacement, tree pit replacement, sealant replacement, and curb replacement. no change in use, egress or occupancy. se…
Replace (2) water source heat pump hvac units as per plans. no change in use, occupancy or egress.
Herewith file to renovate exist. apartment unit #4-160. work includes new non-load bearing wall, new paint, refinish flooring, new/replace plumbing fixtures, and general constructi…
remove the existing rooftop air conditioner and replace in kind. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at the front of the building, west 63rd street, and west neighbor gar…
Filing for facade repair work for floors 001-015 as per plans filed herewith. no change in egress, use or occupancy.
Minor interior renovation to apartment #PHC. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Interior renovation of existing demised retail tenant, new non-load bearing partitions, ceilings and finishes on 2nd & 3rd Floor Marketing/3rd & 4th Floor Construction as shown on…
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at west 60th street and west 61st street elevations.
Remove (2) low pressure steam boilers & replace with (2) new low pressure hot water boilers. replace (2) new combination #2 oil/nat gas burners. replace associated pumps and piping…
Facade repairs, including terra cotta and concrete patching, as well as brick, terra cotta, and lintelreplacements as shown on the drawings filed herewith. no change in use, egress…
. installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy installation of temporary custom color sidewalk shed at central park west…
Proposed interior renovation of existing apartment with new finishes. no change in use, egress and occupancy.