837 issued permits in West Village, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
837 permits
Roof repair maintenance and partial roof replacement to resolve leaking issues as per plans (Hines Emergency Roof Replacement.) No change to use, egress or occupancy.
Mechanical work associated with restaurant tenant space on cellar and 1st floor, as shown on plans filed herewith.
Modifications to the existing Sprinkler System: Remove (3) heads and install (3) new heads on the 6th Floor; Remove (4) heads, relocate (12) heads and Install (4) new sprinkler hea…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Interior partial-renovation to 6th floor unit # 620 - In conjunction with the OT # M01380366-I1 removal of two existing HVAC units to be replaced with in-kind units.
Hereby filing to renovate greenhouse at the facilities roof level as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of a heavy duty sidewalk shed as per plans in conjunction with nb construction. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc b…
Interior renovation to Kitchen and Bathroom and replacement of fixtures
We respectfully wish to do interior demolition of partition walls, etc. at the cellar, Toilet room and fixtures to be relocated. all plumbing fixtures to remain. No plumbing work.
Plumbing work in conjunction witht the interior renovation of apartment 15cd on the 013 floor. no change of use ,egress or occupancy.
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
Proposed plumbing work, installing gas piping and appliances as per submitted plans in connection with existing store.
Installation of new business accessory awning at osp as per plan. no change in use, occupancy or egress.
We respectfully wish to remove One lavatory and One Water Closet at the cellar as per plans . Add 3 fixture bathroom to first floor. Duct and Piping Insulation.
Gc application to construct new partitions, install new flooring, construct model kitchen and bath
Interior renovation of apartment 15cd on the 013 floor, including partitions, and interior finishes. no change of use ,egress or occupancy.
Plumbing scope of work in-conjunction with general construction interior/exterior renovation application, for proposed 1-fam dwelling.