1,016 issued permits in West Village, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,016 permits
Removal & installation of duffusers & associated ductwork, piping & accessories. instllation of fan coil units. all exisitng mechanical equipment, ductwork, piping & accessories to…
Interior renovation to existing apt. 11N. Work to include non-structural demolition, general construction, and related finishes. No change in use, egress, or occupancy.
VERIZON - Relocate/replace 6 antennas & 6 RRHs, relocate 3 MDBs, install 1 RRHs, remove 3 ballast frames, remove 4 cabinets from existing platform and install 1 new cabinet. All wo…
Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, egress or occupancy. sidewalk shed shall comply with chapter 33 of nycc
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing work as per plans.
Perform plumbing modification work in conjunction with apt#2c renovation. remove, relocate and replace plumbing fixtures. general construction work filed under initial application.…
Minor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress or…
Mechanical work as per plans.
Installation of new HVAC equipment and ductwork
Herewith filing boiler and tank removal as per plans. no change in use, egress or occupancy
Proposed renovation of an existing commercial space located on the 6th floor. there is no change in use or occupancy under this application
Interior cellar renovations of lounge, room, showers and toilets and locker rooms, first floor office and single used toilet room