452 issued permits in Queensbridge-Ravenswood-Dutch Kills, part of Queens, New York. Refreshed every 6 hours from the city's public permit feed.
452 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of 8ft high Plywood construction fence as per approved plans
Interior renovation of exist. 1-story garage. work only at cellar, 1st floor.
Exterior and interior renovation of existing 2-story mixed-use building. no change to exist. use, egress or occupancy. to including resolving ecb viol. #35244511k, #37009467p, #343…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary p/m hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist shall comply with chapter 33 of nyc build…
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Propose to install plumbing fixtures all as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
Replacement of existing vacuum/condensate pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-…
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the buildin…
removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Hoist installation for roof repairs, no change in use,egress, or occupancy.