136 issued permits in St. George-New Brighton, part of Staten Island, New York. Refreshed every 6 hours from the city's public permit feed.
136 permits
Install 2-fixture rest room with 3 floor drain at first floor interior of church building
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
plumbing fixtures associated with residential renovation at first floor
plumbing fixtures associated with residential renovation, fist floor
Storm Drainage piping - OSP
Resolve ecb violation: 34256360y and dob violation: vw 051800c0102m;to remove illegal mezzanine as per plan. no change in use, egress or occupancy under this application.
Work type filed for direct replacement of 1 ac unit on existing osp of building and furnace at existing 1st floor commercial space.application filed to obtain certificate of compli…
Provide temporary shoring for the entire building to safely address/correct any strucutral defects
Full hand demolition of a 2 story building using handheld devices. foundation to be removed using mechanical means
Installation of plumbing fixtures and fire sprinkler system with valves for commercial building.