Other Permits in Staten Island, New York
1,219 other permits filed recently
1,219 permits
Upgrade dust collection system, replace ductwork and associated ventilation system.
Construct detached two family residence with accessory off street parking for two cars and detached one car garage (filed under separate application).
Application filed to supersede application #520320304 which was filed for erection of a free-standing temporary tent structure (place of assembly) at the side of existing three-story eating and drinki...
P.s. 019-r: structural work type for a new 3 story school building.
Install construction fence per emergency order
Plans and documents filed to install concrete foundation for structures accessory to existing residence
Kidstrong-- Installation of new RTU and distribution for kid's gym buildout.
Removal and installation of walls, doors, floor finishes and ceilings as per plan. no change in use, egress or occupancy.
Replace existing r.t.u as per plans. no change in use, egress or occupancy.
Plans and documents filed to install concrete foundation for structures accessory to existing residence
Kidstrong-- Installation of new RTU and distribution for kid's gym buildout.
Replace existing r.t.u as per plans. no change in use, egress or occupancy.
Construct detached two family residence with accessory off street parking for two cars and detached one car garage (filed under separate application).
Application filed to supersede application #520320304 which was filed for erection of a free-standing temporary tent structure (place of assembly) at the side of existing three-story eating and drinki...
Installation of new stucco finish on front (north) elevation for 1 story building. no change in use, occupancy and egress under this application.
Install new temporary wood construction fence, 8'-0 heightand paint hunter green
Structural reinforcement of existing framing to support new medical equipment. no change in use, egress or occupancy.
Application is filed for the construction of a 8'-0 high plywood temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under this applicat...
Installation of bess, ess tax
Upgrade dust collection system, replace ductwork and associated ventilation system.